Task 52 — linkage & exchange across Subtasks A, B and CIndicative concept · Task-level

A cross-cutting activity that connects technology assessment (A), supply chains (B) and global pathways (C). The dotted flows are the themes exchanged between the subtasks. Hover a subtask or a flow.

 A↔B themes  A↔C themes  B↔C themes — hover a subtask or a flow

Indicative concept only — for illustration, not citation. A descriptive map of how Task 52's subtasks connect and the themes exchanged between them.